Scenario
A municipal wastewater treatment plant in Tampa, FL, is upgrading its pH neutralization system. A new sodium hydroxide (NaOH) dosing line must be installed to inject 5% w/w aqueous NaOH solution into a 24-inch main effluent pipe. Space constraints limit valve installation to a vertical riser with maximum allowable pressure drop of 0.8 bar to avoid pump head overloading. The piping layout prohibits use of valves larger than 3 inches due to existing flange spacing and structural supports.
Given Data
- Flow Rate: 42.5 m³/h (design peak dosing rate)
- Pressure Drop: 0.8 bar
- Fluid Density: 1050 kg/m³ (5% NaOH at 25°C)
- Specific Gravity: 1.05
- Viscosity: 1.4 cP
Calculation
Using the Control Valve Sizing Calculator:
-
Input values are entered directly:
flow_rate=42.5,pressure_drop=0.8,fluid_density=1050,specific_gravity=1.05,viscosity=1.4 -
The tool computes Cv using the standard ISA/IEC liquid sizing equation:
$$ C_v = \frac{Q}{\sqrt{\frac{\Delta P}{SG}}} = \frac{42.5}{\sqrt{\frac{0.8}{1.05}}} \approx \frac{42.5}{0.873} \approx 48.7 $$
(Note: The calculator applies unit correction factors for m³/h → US gpm and bar → psi internally; final Cv is normalized to standard definition.)
-
With Cv ≈ 48.7, the tool interpolates from standard valve sizing tables (e.g., ANSI B16.34 globe valve flow curves), accounting for Reynolds number correction (Re ≈ 125,000 → turbulent flow, no viscosity derating needed). It recommends a nominal valve size of 2.0 inches, confirmed by checking that 2" globe valves with ported trim achieve Cv = 49–52 at 100% opening.
Result and Decision
A 2-inch ANSI Class 150 stainless steel (ASTM A351 CF8M) globe valve with equal-percentage trim was selected. It fits the spatial envelope, delivers required turndown (10:1), and avoids cavitation (calculated sigma factor = 2.1 > 1.8 threshold). Installation proceeded without piping modifications.
Lesson
Always cross-check calculated valve size against physical installation constraints before final selection — a technically optimal Cv may be unusable if the corresponding valve body cannot be accommodated in the available space or flange configuration.